Center Point Chickasaw Facility
200 Viaduct Road, Chickasaw, AL 36611
LIKELY ACTIVELAST SEEN IN FEDERAL DATA APR 2026 · 2 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Petroleum Refineries324110Where it is
30.76300, -88.05243 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Jgw-1 Asphalt Plant | Mobile | Asphalt Paving Mixture and Block Manufacturing 324121 | UNVERIFIED | 1.0 KM |
| John G Walton Construction Company, INC. | Chickasaw | Asphalt Paving Mixture and Block Manufacturing 324121 | LIKELY ACTIVE | 1.0 KM |
| Mobile Asphalt Company - Saraland | Saraland | Asphalt Paving Mixture and Block Manufacturing 324121 | UNVERIFIED | 3.0 KM |
| Mobile Asphalt CO LLC | Saraland | Asphalt Paving Mixture and Block Manufacturing 324121 | LIKELY ACTIVE | 3.4 KM |
| Bwc Alabama, LLC - Blakeley | Mobile | Asphalt Shingle and Coating Materials Manufacturing 324122 | UNVERIFIED | 4.7 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, BR, EIS, ICIS, NPDES, PERMIT TRACKING, RCRAINFO, TRIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | APR 2026 | APR 2026 |
| EPA FRS | EXISTENCE | AUG 2024 | AUG 2024 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
