Ford Meter Box CO INC
815 Miles Pkwy, Pell City, AL 35125
ACTIVELAST SEEN IN FEDERAL DATA DEC 2025 · 4 SOURCES
Operating signal within 12 months from two or more independent sources.
What they make
Fabricated Pipe and Pipe Fitting Manufacturing332996Where it is
33.60203, -86.25789 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| The Ford Meter Box Company, INC. (dowzer) | Pell City | Fabricated Pipe and Pipe Fitting Manufacturing 332996 | UNVERIFIED | 0.3 KM |
| Trinity Design Group LLC | Pell City | Fabricated Structural Metal Manufacturing 332312 | ACTIVE | 0.5 KM |
| Energy Absorption Systems INC Plt 1577 | Pell City | Fabricated Structural Metal Manufacturing 332312 | LIKELY ACTIVE | 1.7 KM |
| Nicholson Manufacturing LTD. | Pell City | All Other Miscellaneous Fabricated Metal Product Manufacturing 332999 | LIKELY ACTIVE | 1.8 KM |
| Coosa Guns & Outdoors LLC | Pell City | Small Arms, Ordnance, and Ordnance Accessories Manufacturing 332994 | ACTIVE | 5.0 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 4 FEDERAL SOURCES, 7 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, EIS, ICIS, NCDB, NPDES, PERMIT TRACKING, RCRAINFO, TRIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| OSHA ITA | OPERATING | DEC 2025 | DEC 2025 |
| EPA ECHO | OPERATING | SEP 2025 | SEP 2025 |
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
| EPA FRS | EXISTENCE | JUN 2017 | JUN 2017 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| EMPLOYEE BAND | OSHA ITA | DEC 2025 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
