Memkor INC
10051 E Dynamite Blvd, Ste 120, Scottsdale, AZ 85262
Operating signal within 12 months from two or more independent sources.
What they make
Computer Storage Device Manufacturing334112MEMKOR manufactures secure, rugged solid-state drives (SSDs) in multiple series including TANGERINE, ORANGE, and BLACK, along with specialized form factors such as VPX, XMC, FRED, and SPACE SSD, as well as rugged SATA connectors. The company holds FIPS 140-2 VALIDATED certification.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Juggernaut Defense LLC | Scottsdale | Computer Terminal and Other Computer Peripheral Equipment Manufacturing 334118 | ACTIVE | 10.9 KM |
| Digital Systems Engineering INC | Scottsdale | Computer Terminal and Other Computer Peripheral Equipment Manufacturing 334118 | ACTIVE | 10.9 KM |
| Axon Enterprise, INC. | Scottsdale | Audio and Video Equipment Manufacturing 334310 | ACTIVE | 10.9 KM |
| Systems Integration Plus, LLC | Scottsdale | Electronic Computer Manufacturing 334111 | ACTIVE | 14.5 KM |
| Desert Rotor, LLC | Scottsdale | Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing 334511 | ACTIVE | 14.7 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 8 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | APR 2026 | APR 2026 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | SAM GOV | APR 2026 |
| CAGE CODE | SAM GOV | APR 2026 |
| CITY | SAM GOV | APR 2026 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| NAME | SAM GOV | APR 2026 |
| REGISTRATION EXPIRATION | SAM GOV | APR 2026 |
| STATE | SAM GOV | APR 2026 |
| WEBSITE | SAM GOV | APR 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


