Baldwin Contracting (stony Cr)
Highway 32 (3 Mi. West), Hamilton City, CA 95951
UNVERIFIEDLAST SEEN IN FEDERAL DATA — · 1 SOURCE
Present in a source dataset, with no recent operating signal.
What they make
Asphalt Paving Mixture and Block Manufacturing324121Where it is
39.74188, -122.07347 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Ray E Toney | Orland | All Other Petroleum and Coal Products Manufacturing 324199 | UNVERIFIED | 10.5 KM |
| Baldwin Contracting (road 7) | Orland | Asphalt Paving Mixture and Block Manufacturing 324121 | UNVERIFIED | 12.3 KM |
| Franklin Skyway Asphalt Plant | Chico | Asphalt Paving Mixture and Block Manufacturing 324121 | UNVERIFIED | 25.7 KM |
| Billjoe Pest Control INC Dba Shelby's Pest Control | Paradise | Petroleum Lubricating Oil and Grease Manufacturing 324191 | UNVERIFIED | 39.9 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 1 FEDERAL SOURCE, 5 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in EIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA FRS | EXISTENCE | JAN 2019 | JAN 2019 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
