Operating signal within 12 months from two or more independent sources.
What they make
Fluid Power Cylinder and Actuator Manufacturing333995GarKenyon designs, fabricates, assembles and tests hydro-mechanical, electromechanical and mechanical components and assemblies for aerospace, including accumulator gauges, actuators, bleed valves, check valves, emergency brakes, flow fuses, manifolds, master brake cylinders, parking brakes, pressure regulators, relief valves, restrictors, shimmy dampers, shutoff valves, shuttle valves and water fill valves for airplane and helicopter products. The company also produces pneumatic control valves and pressure regulators for missile systems including Sidewinder, Chaparral, Hawk, Sparrow, Tactical Tomahawk and Patriot. GarKenyon holds AS9100/ISO 9001 certification.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| T G Industries, INC. | Meriden | All Other General Purpose Machinery Manufacturing 333999 | UNVERIFIED | 2.5 KM |
| Equipment Depot Northeast, Inc. - Wallingford | Wallingford | Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing 333924 | LIKELY ACTIVE | 3.6 KM |
| H. Goodmaster & Son INC | Wallingford | All Other Miscellaneous General Purpose Machinery Manufacturing 333998 | UNVERIFIED | 3.8 KM |
| Production Equipment Company, the | Meriden | Overhead Traveling Crane, Hoist, and Monorail System Manufacturing 333923 | ACTIVE | 4.4 KM |
| Dukane Connecticut | Wallingford | Welding and Soldering Equipment Manufacturing 333992 | LIKELY ACTIVE | 4.8 KM |
Also at this address
1 other record shares this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 8 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in OSHA-OIS.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | DEC 2025 | DEC 2025 |
| EPA FRS | EXISTENCE | SEP 2018 | SEP 2018 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| ADDRESS LINE1 | SAM GOV | DEC 2025 |
| CAGE CODE | SAM GOV | DEC 2025 |
| CITY | EPA FRS | JUL 2026 |
| CITY | SAM GOV | DEC 2025 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| NAME | SAM GOV | DEC 2025 |
| REGISTRATION EXPIRATION | SAM GOV | DEC 2025 |
| STATE | EPA FRS | JUL 2026 |
| STATE | SAM GOV | DEC 2025 |
| WEBSITE | SAM GOV | DEC 2025 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


