Reichhold LLC 2
425 S Pace Blvd, Pensacola, FL 32502
LIKELY ACTIVELAST SEEN IN FEDERAL DATA JUN 2025 · 3 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Plastics Material and Resin Manufacturing325211Where it is
30.40740, -87.24198 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Polynt Composites USA INC. | Pensacola | Plastics Material and Resin Manufacturing 325211 | UNVERIFIED | 0.0 KM |
| Kraton Chemical, Llc-pensacola, Fl | Pensacola | Other Basic Organic Chemical Manufacturing 325191 | LIKELY ACTIVE | 0.0 KM |
| Pensacola Facility | Pensacola | Plastics Material and Resin Manufacturing 325211 | LIKELY ACTIVE | 0.0 KM |
| Pall Membrane Technology Center | Pensacola | Artificial and Synthetic Fibers and Filaments Manufacturing 325221 | UNVERIFIED | 13.3 KM |
| Santoprene Production Pensacola - Celanese | Cantonment | Synthetic Rubber Manufacturing 325212 | LIKELY ACTIVE | 20.4 KM |
Also at this address
2 other records share this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, BR, FDM, ICIS, NCDB, OSHA-OIS, RCRAINFO, TRIS, TSCA · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA FRS | EXISTENCE | MAY 2026 | MAY 2026 |
| EPA ECHO | OPERATING | JUN 2025 | JUN 2025 |
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
