Operating signal within 12 months from two or more independent sources.
What they make
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing334511EMC Technologies Inc. designs and fabricates functional test fixtures, test systems, interface test adapters, electro-mechanical test equipment, and cable assemblies including custom cables and PCB assemblies for MIL and commercial applications. The company offers engineering design services, build-to-print services, and test system integration. The company holds ISO 9001:2015 certification and is ITAR Registered.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
CERTIFICATIONS — LISTED ON THE COMPANY’S WEBSITE
- ISO 9001
- ITAR registered
Read from this company’s own website on August 9, 2026. Nobody at the facility has confirmed it here, and FactoryRegistry has not verified these — unlike operating status, which comes from independent public records. A certificate can lapse without the website changing, so ask the facility for current ones.
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| L3harris Oceanserver INC | Fall River | Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing 334511 | UNVERIFIED | 0.8 KM |
| Xilectric, INC | Fall River | Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals 334515 | ACTIVE | 1.2 KM |
| MA, Fall River - 275 Martine St. (IMS-M) | Fall River | Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing 334511 | LIKELY ACTIVE | 1.2 KM |
| L3 Technologies INC | Fall River | Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing 334511 | ACTIVE | 1.2 KM |
| Taco INC | Fall River | Power Boiler and Heat Exchanger Manufacturing 332410 | UNVERIFIED | 2.0 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 8 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | OCT 2025 | OCT 2025 |
| EPA FRS | EXISTENCE | SEP 2023 | SEP 2023 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| ADDRESS LINE1 | SAM GOV | OCT 2025 |
| CAGE CODE | SAM GOV | OCT 2025 |
| CITY | EPA FRS | JUL 2026 |
| CITY | SAM GOV | OCT 2025 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| NAME | SAM GOV | OCT 2025 |
| REGISTRATION EXPIRATION | SAM GOV | OCT 2025 |
| STATE | EPA FRS | JUL 2026 |
| STATE | SAM GOV | OCT 2025 |
| WEBSITE | SAM GOV | OCT 2025 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


