Circuit Technology Center, INC.
22 Parkridge Road, Haverhill, MA 01835
Operating signal within 12 months from two or more independent sources.
What they make
Printed Circuit Assembly (Electronic Assembly) Manufacturing334418Circuit Technology Center performs circuit board rework, repair, component tinning, and reballing services. The company uses robotic hot solder dip systems for tinning, Air-Vac systems for BGA reballing, and x-ray inspection equipment. The text references IPC-certified technicians and IPC/JEDEC compliance in their work, along with adherence to GEIA-STD-0006 and J-STD-001 standards.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
CERTIFICATIONS — LISTED ON THE COMPANY’S WEBSITE
- ISO 9001
- ITAR registered
Read from this company’s own website on August 9, 2026. Nobody at the facility has confirmed it here, and FactoryRegistry has not verified these — unlike operating status, which comes from independent public records. A certificate can lapse without the website changing, so ask the facility for current ones.
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Winchester Interconnect Rf Corporation | Haverhill | Other Electronic Component Manufacturing 334419 | LIKELY ACTIVE | 0.1 KM |
| Circuit Board Express | Haverhill | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 0.3 KM |
| Seica INC | Haverhill | Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals 334515 | ACTIVE | 0.4 KM |
| Sanmina CORP. Tech Center East Division | Haverhill | Bare Printed Circuit Board Manufacturing 334412 | UNVERIFIED | 0.5 KM |
| Rapid Coatings INC | Haverhill | Printed Circuit Assembly (Electronic Assembly) Manufacturing 334418 | ACTIVE | 0.4 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 8 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | DEC 2025 | DEC 2025 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | SAM GOV | DEC 2025 |
| CAGE CODE | SAM GOV | DEC 2025 |
| CITY | SAM GOV | DEC 2025 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| NAME | SAM GOV | DEC 2025 |
| REGISTRATION EXPIRATION | SAM GOV | DEC 2025 |
| STATE | SAM GOV | DEC 2025 |
| WEBSITE | SAM GOV | DEC 2025 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


