Operating signal within 12 months from two or more independent sources.
What they make
Battery Manufacturing335910Nanoramic manufactures electrode technology for lithium-ion batteries called Neocarbonix, which replaces materials used in conventional Li-ion battery manufacturing. The technology is applicable across industries and is designed to reduce battery costs, improve energy density, and enable fast charging and high-power capabilities.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Solid Energy Systems LLC 35 Cabot | Woburn | Battery Manufacturing 335910 | LIKELY ACTIVE | 0.2 KM |
| Mascon, INC. | Woburn | All Other Industrial Machinery Manufacturing 333248 | ACTIVE | 0.3 KM |
| Solid Energy Systems INC | Woburn | Battery Manufacturing 335911 | LIKELY ACTIVE | 0.6 KM |
| Gsr Global CORP | Woburn | Fiber Optic Cable Manufacturing 335921 | LIKELY ACTIVE | 1.3 KM |
| Boston Electrometallurgical CORP | Woburn | Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum) 331492 | ACTIVE | 1.2 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 9 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | MAR 2026 | MAR 2026 |
| OSHA ITA | OPERATING | DEC 2025 | DEC 2025 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | SAM GOV | MAR 2026 |
| CAGE CODE | SAM GOV | MAR 2026 |
| CITY | SAM GOV | MAR 2026 |
| EMPLOYEE BAND | OSHA ITA | DEC 2025 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| NAME | SAM GOV | MAR 2026 |
| REGISTRATION EXPIRATION | SAM GOV | MAR 2026 |
| STATE | SAM GOV | MAR 2026 |
| WEBSITE | SAM GOV | MAR 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


