FactoryRegistry
Claim a page

Our Next Energy INC.

45145 W 12 Mile Rd, Novi, MI 48377

ACTIVELAST SEEN IN FEDERAL DATA AUG 2026 · 2 SOURCES

Operating signal within 12 months from two or more independent sources.

Visit websiteDirectionsGo to companyClaim this pageGet the badge
Homepage of Our Next Energy INC.
Their homepage, crawled AUG 2026

What they make

Battery Manufacturing335910

ONE is a US manufacturer of lithium-ion batteries, specifically LFP (lithium iron phosphate) batteries, for grid storage, rail, and defense applications. The company operates manufacturing facilities in Michigan, including the ONE Circle cell factory that produces LFP cells, and a Novi pack facility that supports rail and energy storage system products. The company holds ISO 9001 certification and UN 38.3 certification of the ONE OTP Cell.

SUMMARIZED FROM THE COMPANY’S OWN WEBSITE

Where it is

42.49507, -83.49286 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
A123 Systems LLCNoviBattery Manufacturing
335910
UNVERIFIED0.7 KM
Comau LLCNoviSpecial Die and Tool, Die Set, Jig, and Fixture Manufacturing
333514
UNVERIFIED1.6 KM
Gen Power Products INCWixomAll Other Miscellaneous Electrical Equipment and Component Manufacturing
335999
UNVERIFIED3.1 KM
Magnetech CorporationNoviRelay and Industrial Control Manufacturing
335314
ACTIVE4.7 KM
Commerce Controls INCNoviRelay and Industrial Control Manufacturing
335314
LIKELY ACTIVE4.0 KM

Every listed plant in Oakland County

Also at this address

No other federal record shares this street address.

WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 8 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

SourceEvidenceFirst seenLast seen
COMPANY SITEOPERATINGJUL 2026AUG 2026
SAM GOVOPERATINGAPR 2026APR 2026
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
ADDRESS LINE1SAM GOVAPR 2026
CAGE CODESAM GOVAPR 2026
CITYSAM GOVAPR 2026
GEOMCENSUS GEOCODERJUL 2026
NAMESAM GOVAPR 2026
REGISTRATION EXPIRATIONSAM GOVAPR 2026
STATESAM GOVAPR 2026
WEBSITESAM GOVAPR 2026

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal