Operating signal within 12 months from two or more independent sources.
What they make
Electroplating, Plating, Polishing, Anodizing, and Coloring332813ISO Finishing provides mass finishing services including deburring, deflashing, descaling, polishing, and radiusing using centrifugal barrel finishing equipment. The company serves industries including additive manufacturing, aerospace and aviation, automotive, coating and plating, energy, firearms, medical, military and defense, and precision manufacturing.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Grove Building LLC | Maple Grove | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers 332812 | UNVERIFIED | 0.0 KM |
| Abelconn, a Celestica Company | Maple Grove | Electroplating, Plating, Polishing, Anodizing, and Coloring 332813 | ACTIVE | 1.2 KM |
| Creative Powder Coating | Maple Grove | Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers 332812 | UNVERIFIED | 1.5 KM |
| Great Lakes Engineering, INC | Maple Grove | Machine Shops 332710 | ACTIVE | 1.5 KM |
| Technical Plating INC | Minneapolis | Electroplating, Plating, Polishing, Anodizing, and Coloring 332813 | UNVERIFIED | 1.5 KM |
Also at this address
2 other records share this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 8 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in MN-TEMPO, RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | OCT 2025 | OCT 2025 |
| EPA FRS | EXISTENCE | JUN 2016 | JUN 2016 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| ADDRESS LINE1 | SAM GOV | OCT 2025 |
| CAGE CODE | SAM GOV | OCT 2025 |
| CITY | EPA FRS | JUL 2026 |
| CITY | SAM GOV | OCT 2025 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| NAME | SAM GOV | OCT 2025 |
| REGISTRATION EXPIRATION | SAM GOV | OCT 2025 |
| STATE | EPA FRS | JUL 2026 |
| STATE | SAM GOV | OCT 2025 |
| WEBSITE | SAM GOV | OCT 2025 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


