FactoryRegistry
Claim a page

Electrisio, INC.

610 Dunbar St, Durham, NC 27701

ACTIVELAST SEEN IN FEDERAL DATA AUG 2026 · 2 SOURCES

Operating signal within 12 months from two or more independent sources.

Visit websiteDirectionsGo to companyClaim this pageGet the badge
Homepage of Electrisio, INC.
Their homepage, crawled JUL 2026

What they make

All Other Miscellaneous Electrical Equipment and Component Manufacturing335999

Electrisio builds ground-embedded wireless charging pads for electric vehicles that install with four bolts without requiring trenching or excavation. The pads deliver 50kW of wireless power output with a target system efficiency of at least 85 percent and are designed to serve fleets, autonomous vehicles, warehouse robots, and premium infrastructure. The company targets the EV charging market across multiple segments with a prototype planned for Q4 2026.

SUMMARIZED FROM THE COMPANY’S OWN WEBSITE

Where it is

35.97858, -78.89869 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS
STREET VIEW

Other plants nearby

FacilityCityIndustryStatusDistance
Firstmark Aerospace CorporationDurhamAll Other Miscellaneous Electrical Equipment and Component Manufacturing
335999
UNVERIFIED2.2 KM
Parata Systems, LLCDurhamAll Other Miscellaneous Electrical Equipment and Component Manufacturing
335999
UNVERIFIED7.4 KM
Micross Advanced Interconnect TechResearch Triangle ParkAll Other Miscellaneous Electrical Equipment and Component Manufacturing
335999
LIKELY ACTIVE7.2 KM
Cyberlux CORPDurhamAircraft Manufacturing
336411
ACTIVE7.5 KM
Eejuhs Logistics, INCRaleighBolt, Nut, Screw, Rivet, and Washer Manufacturing
332722
LIKELY ACTIVE12.7 KM

Every listed plant in Durham County

Also at this address

No other federal record shares this street address.

WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 8 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

SourceEvidenceFirst seenLast seen
COMPANY SITEOPERATINGJUL 2026AUG 2026
SAM GOVOPERATINGJUL 2026JUL 2026
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
ADDRESS LINE1SAM GOVJUL 2026
CAGE CODESAM GOVJUL 2026
CITYSAM GOVJUL 2026
GEOMCENSUS GEOCODERJUL 2026
NAMESAM GOVJUL 2026
REGISTRATION EXPIRATIONSAM GOVJUL 2026
STATESAM GOVJUL 2026
WEBSITESAM GOVJUL 2026

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal