Operating signal within 12 months from two or more independent sources.
What they make
Fluid Power Valve and Hose Fitting Manufacturing332912Clean Air Power manufactures fuel injection technology for low-carbon and zero-emission powertrains. The company's injectors are designed to support alternative fuels including biomethane, hydrogen, and ammonia in applications such as zero-emission combustion engines and fuel cell technologies. The company serves on-highway, off-highway, mining, marine, and industrial sectors.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Triad Fabrications | Kernersville | Fabricated Structural Metal Manufacturing 332312 | UNVERIFIED | 2.3 KM |
| Production Tracking Design, LLC | Kernersville | Fabricated Pipe and Pipe Fitting Manufacturing 332996 | ACTIVE | 6.4 KM |
| Parker Hannifin Corporation - Aerospace Filtration Division | Greensboro | All Other Converted Paper Product Manufacturing 322299 | UNVERIFIED | 7.0 KM |
| Filtration Greensboro HAFD | Greensboro | All Other Miscellaneous Fabricated Metal Product Manufacturing 332999 | LIKELY ACTIVE | 7.1 KM |
| Filtration Greensboro IPF | Greensboro | All Other Miscellaneous Fabricated Metal Product Manufacturing 332999 | LIKELY ACTIVE | 7.5 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 8 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | MAR 2026 | MAR 2026 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | SAM GOV | MAR 2026 |
| CAGE CODE | SAM GOV | MAR 2026 |
| CITY | SAM GOV | MAR 2026 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| NAME | SAM GOV | MAR 2026 |
| REGISTRATION EXPIRATION | SAM GOV | MAR 2026 |
| STATE | SAM GOV | MAR 2026 |
| WEBSITE | SAM GOV | MAR 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.


