Flexenergy Energy Systems INC
1 Progress Drunit 11, Dover, NH 03820
LIKELY ACTIVELAST SEEN IN FEDERAL DATA OCT 2025 · 2 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Turbine and Turbine Generator Set Units Manufacturing333611Where it is
43.17868, -70.90260 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Turbocam Energy Solutions | Dover | Precision Turned Product Manufacturing 332721 | LIKELY ACTIVE | 0.9 KM |
| Turbocam, INC. | Barrington | Machine Shops 332710 | ACTIVE | 8.2 KM |
| Solid Machine LLC | Rochester | Machine Shops 332710 | ACTIVE | 11.5 KM |
| Spaulding Composites INC | Rochester | Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing 326130 | LIKELY ACTIVE | 11.5 KM |
| Turbocam LLC | Barrington | Machine Shops 332710 | LIKELY ACTIVE | 10.4 KM |
Also at this address
No other federal record shares this street address.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | OCT 2025 | OCT 2025 |
| EPA FRS | EXISTENCE | JAN 2021 | JAN 2021 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
