FactoryRegistry
Claim a page

Lyophilization Services of New England Sundial

1 Sundial Ave., Manchester, NH 03103

ACTIVELAST SEEN IN FEDERAL DATA AUG 2026 · 2 SOURCES

Operating signal within 12 months from two or more independent sources.

DirectionsClaim this pageGet the badge

What they make

Surgical Appliance and Supplies Manufacturing339113

Products

Made or handled here · 6
Agent, Absorbable Hemostatic, Collagen Based · Clamp, Vascular · Dura Substitute · Filler, Bone Void, Calcium Compound · Intracardiac Patch Or Pledget, Biologically Derived · Wound Dressing With Animal-Derived Material(S)
Where these came from
6 from FDA device registration · Federal registry
FDA device establishment 1225991, product code LMF

Where it is

42.97326, -71.46827 · CENSUS TIGER
COUNTY
METRO AREA
ON GOOGLE MAPS

Other plants nearby

FacilityCityIndustryStatusDistance
G Force Braces, LLCManchesterSurgical Appliance and Supplies Manufacturing
339113
ACTIVE1.0 KM
Mobius Bionics LLCManchesterSurgical Appliance and Supplies Manufacturing
339113
ACTIVE2.0 KM
Mobius Mobility LLCManchesterSurgical Appliance and Supplies Manufacturing
339113
ACTIVE2.5 KM
Allard Nazarian Group, INC.ManchesterAll Other Miscellaneous Manufacturing
339999
ACTIVE2.9 KM
Bedford Center for ProsthodonticsBedfordDental Laboratories
339116
UNVERIFIED3.7 KM

Every listed plant in Hillsborough County

Also at this address

1 other record shares this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.

Sundial Administration
Manchester, NH
LIKELY ACTIVE327320EMP 1-19
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 2 FIELDS

Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.

SourceEvidenceFirst seenLast seen
FDA DEVICESOPERATINGAUG 2026AUG 2026
OSHA ITAOPERATINGDEC 2025DEC 2025
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
FIELDSOURCESIGNAL
EMPLOYEE BANDOSHA ITADEC 2025
GEOMCENSUS GEOCODERJUL 2026

Status is computed from independent sources; nothing here is self-reported unless marked Claimed.

Report a correction · Request removal