Tower Automotive Operations USA 1, LLC (0372010213)
630 Southwest St, Bellevue, OH 44811
LIKELY ACTIVELAST SEEN IN FEDERAL DATA DEC 2024 · 3 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Motor Vehicle Electrical and Electronic Equipment Manufacturing336320Where it is
41.26018, -82.84164 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Tower International | Bellevue | Other Motor Vehicle Parts Manufacturing 336399 | UNVERIFIED | 0.2 KM |
| Allied Air Enterprises Bellevue Facility | Bellevue | Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing 333415 | UNVERIFIED | 1.0 KM |
| Bellevue Manufacturing | Bellevue | Other Motor Vehicle Parts Manufacturing 336390 | LIKELY ACTIVE | 1.6 KM |
| Artiflex Mfg Clyde | Clyde | Motor Vehicle Metal Stamping 336370 | LIKELY ACTIVE | 10.9 KM |
| Ventra Sandusky, LLC | Sandusky | Motor Vehicle Electrical and Electronic Equipment Manufacturing 336320 | LIKELY ACTIVE | 19.8 KM |
Also at this address
2 other records share this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, EIS, OH-CORE, OSHA-OIS, RCRAINFO, TRIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | DEC 2024 | DEC 2024 |
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
| EPA FRS | EXISTENCE | FEB 2021 | FEB 2021 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
