Advanced Flow Solutions
9201 N I-35 Service Road, Oklahoma City, OK 73131
LIKELY ACTIVELAST SEEN IN FEDERAL DATA MAR 2025 · 2 SOURCES
Operating signal within 24 months, or from a single source.
What they make
Air and Gas Compressor Manufacturing333912Where it is
35.56351, -97.45339 · CENSUS TIGER
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Equipment Technology, L.l.c. | Oklahoma City | Overhead Traveling Crane, Hoist, and Monorail System Manufacturing 333923 | UNVERIFIED | 6.9 KM |
| Palfinger USA Operations | Oklahoma City | Overhead Traveling Crane, Hoist, and Monorail System Manufacturing 333923 | LIKELY ACTIVE | 7.0 KM |
| Fife CORP | Oklahoma City | All Other General Purpose Machinery Manufacturing 333999 | UNVERIFIED | 7.7 KM |
| Cameron Intl - Compression / Cameron Compression Systems | Oklahoma City | Oil and Gas Field Machinery and Equipment Manufacturing 333132 | UNVERIFIED | 13.1 KM |
| Triangle Pump Components, INC | Oklahoma City | Fluid Power Pump and Motor Manufacturing 333996 | UNVERIFIED | 13.9 KM |
Also at this address
1 other record shares this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 2 FEDERAL SOURCES, 6 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in RCRAINFO · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | MAR 2025 | MAR 2025 |
| EPA FRS | EXISTENCE | JUN 2020 | JAN 2024 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
