Operating signal within 12 months from two or more independent sources.
What they make
Other Metal Valve and Pipe Fitting Manufacturing332919Flowline manufactures corrosion resistant pipe fittings and forgings to ASME/ANSI B16.9 and ANSI B16.11 standards. The company serves the oil and gas industry (upstream, midstream, and downstream operations), power generation (nuclear, geothermal, and natural gas), and other sectors including air separation, cryogenics, mineral chemical processing, desalination, and naval vessels. Flowline is an approved Level 1 SubSafe supplier to the US Navy submarine and aircraft carrier industry.
SUMMARIZED FROM THE COMPANY’S OWN WEBSITE
Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Flowline | New Castle | Fabricated Pipe and Pipe Fitting Manufacturing 332996 | LIKELY ACTIVE | 0.0 KM |
| Flowline Div Ezeflow Usa/new Castle | New Castle | Iron and Steel Pipe and Tube Manufacturing from Purchased Steel 331210 | LIKELY ACTIVE | 0.1 KM |
| Portersville Prd, LLC | New Castle | Industrial Valve Manufacturing 332911 | ACTIVE | 2.3 KM |
| Ellwood Mill Products | New Castle | Iron and Steel Forging 332111 | LIKELY ACTIVE | 2.8 KM |
| Trac Fabrication INC | Volant | Surgical Appliance and Supplies Manufacturing 339113 | ACTIVE | 9.6 KM |
Also at this address
2 other records share this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 3 FEDERAL SOURCES, 8 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in BR, NPDES, PA-EFACTS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| COMPANY SITE | OPERATING | JUL 2026 | AUG 2026 |
| SAM GOV | OPERATING | MAY 2026 | MAY 2026 |
| EPA FRS | EXISTENCE | OCT 2016 | OCT 2016 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| ADDRESS LINE1 | SAM GOV | MAY 2026 |
| CAGE CODE | SAM GOV | MAY 2026 |
| CITY | EPA FRS | JUL 2026 |
| CITY | SAM GOV | MAY 2026 |
| GEOM | CENSUS GEOCODER | JUL 2026 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| NAME | SAM GOV | MAY 2026 |
| REGISTRATION EXPIRATION | SAM GOV | MAY 2026 |
| STATE | EPA FRS | JUL 2026 |
| STATE | SAM GOV | MAY 2026 |
| WEBSITE | SAM GOV | MAY 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.