Bp Cherry Point Refinery
4519 Grandview Rd, Blaine, WA 98230
Operating signal within 12 months from two or more independent sources.
What they make
Petroleum Refineries324110Where it is
Other plants nearby
| Facility | City | Industry | Status | Distance |
|---|---|---|---|---|
| Wa317935426 - B P West Coast Products LLC | Blaine | Petroleum Refineries 324110 | UNVERIFIED | 0.4 KM |
| Bp Cherry Point Refinery Final Effluent Integrity Management Project - Phase 3 | Blaine | Petroleum Refineries 324110 | UNVERIFIED | 0.9 KM |
| Treoil Industries | Ferndale | Petroleum Lubricating Oil and Grease Manufacturing 324191 | UNVERIFIED | 2.2 KM |
| Phillips 66 Refinery | Ferndale | Petroleum Refineries 324110 | ACTIVE | 7.5 KM |
| Asphalt Northwest, LLC | Lynden | Asphalt Shingle and Coating Materials Manufacturing 324122 | UNVERIFIED | 18.3 KM |
Also at this address
2 other records share this street address. Separate filings can describe distinct businesses on one site, or the same plant recorded by different agencies, so every record is kept rather than merged away.
WHERE THIS RECORD COMES FROM — 4 FEDERAL SOURCES, 7 FIELDS
Every fact on this page traces to a public federal filing. The table below names which register holds this facility, whether that register proves the plant operates or only that it exists, and when each of them last saw it.
EPA cross-references this facility in AIR, AIRS/AFS, BR, CEDRI, E-GGRT, EPS, ICIS, NPDES, OSHA-OIS, OTAQREG, RBLC, RCRAINFO, SEMS, SFDW, TRIS, TSCA, WA-FSIS · EPA site type STATIONARY.
| Source | Evidence | First seen | Last seen |
|---|---|---|---|
| EPA ECHO | OPERATING | JUN 2026 | JUN 2026 |
| EPA FRS | EXISTENCE | MAY 2026 | MAY 2026 |
| OSHA ITA | OPERATING | DEC 2025 | DEC 2025 |
| EPA TRI | OPERATING | DEC 2023 | DEC 2023 |
FIELD BY FIELD — WHICH SOURCE SUPPLIED WHAT
| FIELD | SOURCE | SIGNAL |
|---|---|---|
| ADDRESS LINE1 | EPA FRS | JUL 2026 |
| CITY | EPA FRS | JUL 2026 |
| EMPLOYEE BAND | OSHA ITA | DEC 2025 |
| GEOM | EPA FRS | JUL 2026 |
| NAME | EPA FRS | JUL 2026 |
| RCRA GENERATOR STATUS | EPA ECHO | AUG 2026 |
| STATE | EPA FRS | JUL 2026 |
Status is computed from independent sources; nothing here is self-reported unless marked Claimed.
